CIT CAMPUS

Value: $1M (approximately)
Main Contractor: Armstrong Downes
Trade: Mechanical
Consultant: Spencer Holmes


Back To Completed Projects


Contact Fantail



Project Summary

  • Isolation of boilers and demolition of hot water heating systems
  • Total of 9 Floors of Office space across two existing buildings
  • Supply and installation of Hitachi Heat recovery VRF air conditioning, supply air and extract air ventilation including sever and lab rooms pressurisation
  • Seismic installation
  • Electrical for mechanical by Fantail including low level BMS controls
  • 9-month project for Fantail
  • At the time this was Hitachi’s 2nd largest VRF project in Wellington – 460 kilowatts of total cooling